Upstairs view of the finished floor, sanded and varnished. There are three coats of varnish on the hemlock floor. You can't quite slide on it with your socks (which is probably a good thing), but it is a nice finish.
Francois did a nice job, filling in the knots and some of the gaps that opened in the joints (it's what hemlock does).
Showing posts with label 4.0 Timber frame. Show all posts
Showing posts with label 4.0 Timber frame. Show all posts
Sunday, October 30, 2011
Finished railings and floors
The flooring detail shows how the lower grade wood actually works better in the farmhouse. The higher grade hardwood would have made it look like a concert hall or museum.
Wood flooring isn't the ideal covering for a hydronic slab. It does not conduct heat very well, and it requires a high-grade OSB subfloor to keep it stable with the expansion and contraction as well as the high humidity associated with a hydroninc slab. When Francois (the current tenant of the house) is not supplementing with wood, he needs to keep the temperature of the slab at 79 or 80 degrees F to keep things comfortable, about 5 degrees F higher than the recommended temperature for a "naked" floor.
One last finishing touch to go: the floorboards. We've got some hardwood at the sawyer that we'll use for this. It will probably be ash like the staircase.
Floors ... at last!
We finally had the floors installed downstairs and they look great. We had them installed on house II, but decided at the last minute to have part of the hardwood installed on house I.
We chose 2 1/4'' yellow birch in horizon grade (that's actually 3rd grade) from BSL (hardwood floor company from the Gaspe). This grade has knots in it, but that's okay because because the timbers also have knots in them, and the multihued daeker planks bring out the hues in the knots of all the other wood finishing we have.
Yellow birch (as the name implies) has a nice yellowish hue that matches the Hermlock timbers. It's also cheaper than the other hardwood species.
The only thing left to do now is the bedroom whcih will be done with black cherry from our own woods.
We chose 2 1/4'' yellow birch in horizon grade (that's actually 3rd grade) from BSL (hardwood floor company from the Gaspe). This grade has knots in it, but that's okay because because the timbers also have knots in them, and the multihued daeker planks bring out the hues in the knots of all the other wood finishing we have.
The only thing left to do now is the bedroom whcih will be done with black cherry from our own woods.
Saturday, January 29, 2011
Staircase II: Half done
If you look carefully, you'll notice checks (cracks) in the posts and the beams. This is what hemlock does as it dries. It actually tightens and strengthens the frame. The staircase, though, should not do this.
A Handsome Looking House
Here's a nice winter scene of the house. The snow has been pretty unrelenting this winter. I think we've had four days without snow. A scene like this makes me feel like I'm wasting heat. The solar collectors on the roof are covered snow and the sun is shining brightly. You can see the telescopic brush for clearing snow off the collectors leaning against the wall on the porch next to the door.
Thursday, August 19, 2010
Finished painting
With the afternoon sun provided by mother natures, it makes for a really nice picture from the staircase.
Labels:
4.0 Timber frame,
7.0 Windows,
9.0 Interior Millwork,
Millwork,
Progress
Monday, August 16, 2010
Tongue and groove flooring
The 2'' thickness (okay 1 13/16'' after planing) makes for a solid floor. It also reinforces the frame. When the big bad wolf blew down the wooden house, it was not a timber frame.
Siding
Tuesday, June 22, 2010
Finished porch
convinced me to go witht the more solid 6x6 posts. The rest of the porch is straight out of the back of the property. It's hard to see in these pictures, but the wood is unplaned and unsanded. If you click on the imagery, you can see the rough texture. My philosophy on porches is that sitting on them should make you feel like you are in a farm in a western (one with good carpenters). We will eventually sand the floor planks once the project is complete and people are done trekking dirt and construction boots across it. We'll probably seal it to protect it from rain, snow, and sun. Hemlock is somewhat resistant to rot, but it is a soft wood and prone to scuffs.
Saturday, June 5, 2010
The artiste returns
Unfortunately, we did not get the porch up and will have to wait until next week before we see the final product. I can hardly wait.
Moving wood to the driers II
Installing the windows
Thursday, June 3, 2010
Cutting up the logs
We cut most of the hemlock into 1 1/2'' x 6" planks of varying lengths. The lesser quality boards went into the southern porch, but most will eventually go into siding. These will be cut into triangular ship-lap boards these don't need to be dried. We still hven't decided whether to let them weather naturally (into a grey barnlike finish) or to protect the wood with varathane an retain the wooden color.
Moving wood to the driers
Tuesday, June 1, 2010
Rainy day project
Monday, March 1, 2010
Revised wall system
The builder made a few alterations to the wall system on site. In particular, the sill system has been altered. Flooring and base boards are new to the design as well. The extra insulation needed for the foundation needed for the heated floor slab complicate the design a little. Obviously, styrofoam is not going to support the wall trusses.On the other hand, the wall trusses are supported by the timber frame. It's still nice to have part of the wall trusses over the concrete foundation. The southern wall will feature a 4'9'' wide awning to allow full sun on the windows in the winter but little or no sun in the summer. To support the awning, 2'' x 8'' wall studs will be added in line with the trusses.
The photo shows a cross section of the wall system, including the sill board. The shiplapped siding will come down over the foundation insulation and will be sealed at the bottom (seal not shown) to prevent moisture infiltration.
Sunday, January 24, 2010
The view from the loft
Looking at this picture, it's very tempting to change the plans and just make a huge picture window to the second floor wall. A lot of the view will be obliterated by walls, but the windows will be large enough so that you can see Mount Sutton once the poplars are cut down if you place yourself.I'm also tempted to put a small rosetta window in the middle of the triangle at the peak of the wall.
Wednesday, January 20, 2010
Finished ceiling
In the meantime it's now really cozy under the ceiling. It feels a little more like a barn than a house with the winter weather and dampness. You do get an idea of the loftiness of the space. The second picture is actually taken from under the cathedral area in the living room looking towards the second floor.
Labels:
4.0 Timber frame,
9.0 Interior Millwork,
Millwork,
Roof
Thursday, January 7, 2010
Hint of a roof
Although the hemlock was very dry, there was minimal splitting when they nailed them down to the rafters. The planks are actually reddish in hue, contrasting with the timbers which appear to be more yellow/green, depending on the light. I didn't get a final picture because it was too dark, but if you click on the image you might get an idea of what the ceiling will look like.
Digging out
We had a lot of snow over the Christmas break.
It was quite a dig.