Concrete, if used correctly, is a fine thing. Sure, it has a nasty carbon footprint, but note how the footing keeps the water from that little spring pooling in the crevice at bottom right. This is good, because it is not pooling inside the house. Water pooling under the house is not environmental; it leaves mold. We filled this pool with extra concrete left over after the foundation pour. The spring now drains behind the house (to the left of the photo).
Showing posts with label Footing. Show all posts
Showing posts with label Footing. Show all posts
Friday, October 9, 2009
The final footings
Concrete, if used correctly, is a fine thing. Sure, it has a nasty carbon footprint, but note how the footing keeps the water from that little spring pooling in the crevice at bottom right. This is good, because it is not pooling inside the house. Water pooling under the house is not environmental; it leaves mold. We filled this pool with extra concrete left over after the foundation pour. The spring now drains behind the house (to the left of the photo).
Thursday, October 8, 2009
Rebar
The rebar (which will anchor the walls to the footing) is offset slightly to the outside perimeter of the footings to allow for interior pilasters in the foundation wall. Two vertical rebars are placed where the post-supporting pilasters will be poured into the concrete wall.
The the far right of the image also shoes the trench in the rock that runs behind the house . It should divert water from the spring away from the house.
Drainage on north side of house
The north side of the house is naturally drained by a crevice that Normand managed to excavate with the bulldozer. I'm glad he did because it allowed us to position the house adjacent to the crevice as opposed to over it! It actually does run under the northeast corner of the house seen in the back of the image. Fortunately, it is not as deep as pictured in the foreground.
Drainage for spring
It's not as tough as it looks. The concrete mixed with the water and proved to be quite easy to shovel over. Mind you, I wouldn't want to bend over like this all day. This should divert runoff to behind the house for now. I couldn't fill all the way to the footing because the contractor will need to remove his forms. We will fill in that hole when we pour the foundation walls (will be about 3 to 4 feet high).
Pouring the footings
The concrete is 25 MPa concrete (that's megaPascals) for both the footings and foundation walls. According to my calculations, that means it can withstand 100 000 kg loaded onto the 8''x8'' hemlock posts that the foundation will hold. Obviously, the concrete is not the weakest link in the house. It was dry and ready to walk on in about 6 hours. We had ideal conditions for drying: no rain, a little sun in the afternoon, temperatures around 15 C and a light breeze.
We thought that the footprint of the house was awfully small. I double checked a few measurements and they all checked out. The walls will actually stand slightly offset to the outside, so that there is actually a foot more interior room than there appears to be with just the footings.
Wednesday, October 7, 2009
Forms for footings
The plans for the foundation are outlined here.
The foundation contractor (Laroche et fils) showed up with a flat bed and crane that deposited and a nice portable tool shed on the site (see previous post). The excavation had actually left the site more even than anticipated, despite some undulating crevices and depression that caused the water to pool. All in all, the footing ended up having only three steps, and the final height varies by no more than a foot.