Willy is in finishing the stairs and kitchen, while Eric is finishing the shower this week. The workbenches you see here are Willy's portable workshop.
Showing posts with label Progress. Show all posts
Showing posts with label Progress. Show all posts
Saturday, January 29, 2011
Busy looking house site
Lots of work going on inside the house lately. Bathroom accessories, kitchen cabinets, washer driers, light fixtures, and staircases all make for a pile of cardboard boxes, wood scraps and assorted packaging junk. Lisa doesn't like this picture of the mess, but to me it means things are getting done. of curse, Lisa has been busier in the house than I have lately, so she has to look at the pile a lot more than I do.
Willy is in finishing the stairs and kitchen, while Eric is finishing the shower this week. The workbenches you see here are Willy's portable workshop.
In the bedroom, we're storing the pane of tempered glass that will wall off the shower from the rest of the bathroom (while allowing light to shine everywhere) as well as the screen door (minus the screen) that will face onto the front porch. Storage makes for strange bedfellows.
Willy is in finishing the stairs and kitchen, while Eric is finishing the shower this week. The workbenches you see here are Willy's portable workshop.
Labels:
7.0 Windows,
8.0 Porches and decks,
Bathroom,
Progress
A Handsome Looking House
Here's a nice winter scene of the house. The snow has been pretty unrelenting this winter. I think we've had four days without snow. A scene like this makes me feel like I'm wasting heat. The solar collectors on the roof are covered snow and the sun is shining brightly. You can see the telescopic brush for clearing snow off the collectors leaning against the wall on the porch next to the door.
Sunday, October 17, 2010
Roof and chimney flashing
The flashing is important. It keeps the water from infiltrating in the crack between the chimney and the roof metal. We have a leaky roof now in the old place. Not fun. We'll keep the flashing as is.
South-side door
The little step is a temporary measure made of hemlock by Joey because he was sick of using blocks (stacked on the left in the photo) as steps. Oh yeah, the insurance required it as well. I kind of like the steps. With a more suitable footing, we can probably keep them for a while. The stacked blocks are actually off cuts from Willy's timbers, and the carpenters use them to keep the good lumber off the ground.
I'm kind of looking forward to the metal going on the porch roof. Once the solar collectors are installed, that should get done quickly. You want to step on the metal as little possible.
Monday, September 20, 2010
East side progress
It's all done but the south side and the porch. We delivered the last load of siding to the site today, and the boys finished off the south side. The electrician was in today too and was finishing a good amount of switches and sockets (to be shown tomorrow).
It was relatively dry today so the carpenters got to work on east-side siding. Wouldn't the door look good in red?
It's good to see this with the siding on. That unfinished look is getting old real quick. It's encouraging to see that it looks better than we imagined.
Tuesday, September 14, 2010
Framed staircase
Will will soon but in ash railings and steps in. These will make the stairs better than the current temporary carpenters stairs.
Completed upstairs floor
The sink bothers me. We put it too far to the left. It kills me that I can look at that gorgeous ash counter top and only see the sink. There's just too much stuff to do on a house to think of everything and get it all right.
Doors
One thing for sure now that I see it is that we will go with a red door. paint is not appropriate as it will chip, so we'll have to get a nice bright red stain for the door. That will add a splash of color on some rather neutral colors.
Friday, September 10, 2010
West side story
The only thing left on this side is the fascia along the gables of the roof, and maybe some white trim on the fascia of the porch.
Still have the front sides of the house to cover. There are more windows here, so they could be a while. The siding goes up quick. It's the trim around the windows that needs careful sealing to prevent water infiltration.
Sunday, September 5, 2010
Project evolution: before, during, and after
Saturday, Sept 4, 2010
Thursday, June 23, 2010
Thursday, June 2, 2010
Wednesday, March 17, 2010
Wednesday, March 3, 2010
Friday, January 22, 2010
Erected frame: Dec. 18, 2009
Insulated foundation: Nov. 10, 2009
Foundation done before backfill: Oct. 25, 2009
We're on the rock. About 1-2 ft of soil, clay, and sand was removed. Seems the site is a little flatter than anticipated.
During excavation: Oct. 1, 2009
Before excavation: Sept. 10, 2009
Thursday, June 2, 2010
Wednesday, March 17, 2010
Friday, January 22, 2010During excavation: Oct. 1, 2009
Before excavation: Sept. 10, 2009
Window trim detail
The picture below shows the detail of the bottom right corner. You can see the white painted nails in the trim and the stainless steel nails in the hemlock siding. You can also see the paint seal used between the horizontal trim below the window and the vertical trim to the right of the window.
Labels:
7.0 Windows,
9.1 Exterior trim,
Millwork,
Progress,
Wall system
Corner moulding trim details
I think Alex, Gord, and Joey really enjoy this part of the job. They are paying extra attention to detail. It's worth the extra time they take to seal up the joints nicely. It assures we won't have to do this again in 5 or 10 years time (knock wood!).
Soffits
So here are the vented soffits on the edge of the kitchen. We used leftover boards from the ceiling. We had plenty leftover because the supplier of the planks sent about 20% more than ordered; dried hemlock usually splinters quite a bit. We've been handling it carefully, so we had maybe only 5% waste. The carpenters brought in strips of white coated aluminum for the vents. They will look much better when the fascias (roof edges) are also covered in white Maibec.
Time to put on the soffits!
Several creatures have alrady visited the home. Early in the spring, chickadees would fly in the open doorways and not be able to find their way out again. Phoebe's made a nest in a few cornices, and the cat already hunted down a few mice that may their way in through open doorways. I think I heard a few squirrels scratching around in the roof above the kitchen too. Hopefully, having the doors installed and sealing up the soffits will prevent these visits in the future.
Saturday, September 4, 2010
Trim and mouldings
Here's a picture of an outside corner with the west side finished with siding and the south side unfinished. The corner is constructed using two 2'' boards painted on all sides. It is nailed to the furring lats and over white aluminum flashing that covers the blue insulation on the foundation. We should have covered the foundation insulation before back-filling it. Styrofoam is resistant to just about everything except UV radiation from the sun.
Thursday, September 2, 2010
More siding
Wednesday, September 1, 2010
Up goes the siding
Also shown is the white flashing covering the foundation insulation. Hold have put this on a long time ago. Better late than never.
Labels:
7.0 Windows,
9.1 Exterior trim,
Foundation,
Millwork,
Progress,
Revised wall,
Wall system
Thursday, August 19, 2010
Finished painting
With the afternoon sun provided by mother natures, it makes for a really nice picture from the staircase.
Labels:
4.0 Timber frame,
7.0 Windows,
9.0 Interior Millwork,
Millwork,
Progress
Tuesday, June 22, 2010
Delivering heating system
Finished porch
convinced me to go witht the more solid 6x6 posts. The rest of the porch is straight out of the back of the property. It's hard to see in these pictures, but the wood is unplaned and unsanded. If you click on the imagery, you can see the rough texture. My philosophy on porches is that sitting on them should make you feel like you are in a farm in a western (one with good carpenters). We will eventually sand the floor planks once the project is complete and people are done trekking dirt and construction boots across it. We'll probably seal it to protect it from rain, snow, and sun. Hemlock is somewhat resistant to rot, but it is a soft wood and prone to scuffs.