Monday, August 16, 2010

Insulation: before and after

Here's a good sequence of the insulation going into the bedroom wall. The horizontal furring is nailed to the wall trusses and holds the plastic vapor barrier in place. Red tape seals the different flaps of vapor barrier. The insulation is then blown in between the vapor barrier and outside sheathing.

No comments: