Saturday, November 28, 2009

Filling in the foundation

This is Eric with the big loader filling in the foundation, covering the drainage pipes with 1/2'' clear stone. Fortunately, Normand is working a larger project very nearby and these machines just have to rumble over for these little jobs as they come up.

I was careful to remove the wooden supports gingerly and shovel the crushed stone around the drains manually so that they stayed at the level that the plumber installed. The ones seen here are actually the drains for the kichen and the adjacent walk-in pantry.

No comments: