

House is located on solid impermeable rock with less than 1'' of soil. Utilities all end in utility room
- Powerline: 45m above ground; 65 m below ground (yellow)
- Tile bed: 10m x 60m. Percolation test done in area of tile bed. Show's about 4 feet deep of gravel on slight downward slope.
- Septic tank 30 ft from house and 90 ft from well.
- Overflow line from septic goes 30 m downslope of house site to tile bed; approximate drop of about 10 ft; to share a trench with power line
- Driveway: already exists, but grass needs to be scraped off and more gravel added around house
- Well and water line: slightly upslope of house site.
No comments:
Post a Comment