Monday, September 20, 2010

East side progress

Well, it's beyond progress now ... it's done!

It's all done but the south side and the porch. We delivered the last load of siding to the site today, and the boys finished off the south side. The electrician was in today too and was finishing a good amount of switches and sockets (to be shown tomorrow).



9/14/10
It was relatively dry today so the carpenters got to work on east-side siding. Wouldn't the door look good in red?

It's good to see this with the siding on. That unfinished look is getting old real quick. It's encouraging to see that it looks better than we imagined.

Tuesday, September 14, 2010

Framed staircase

We went with Plan A on the stairs, which was to enclose the area beneath them for closet and storage. The option was open risers, but those usually need a bigger space to look good. This was the right decision.

Will will soon but in ash railings and steps in. These will make the stairs better than the current temporary carpenters stairs.

Completed upstairs floor

Here's a picture of the completed upstairs landing. The edge trim of the floor was added this week on a rainy day. Nice job on the corners. I'm glad we have carpenters that like making it look nice.

The sink bothers me. We put it too far to the left. It kills me that I can look at that gorgeous ash counter top and only see the sink. There's just too much stuff to do on a house to think of everything and get it all right.

Doors

Well, the trash clutters up the view a bit, but here's the door trimmed with the white Maibec and with a temporary step leading up to the porch. It will look better once the siding is on. Still haven't decided on a permanent solution for the stairs, which will get dripped on by runoff from the roof.

One thing for sure now that I see it is that we will go with a red door. paint is not appropriate as it will chip, so we'll have to get a nice bright red stain for the door. That will add a splash of color on some rather neutral colors.

Friday, September 10, 2010

West side story

Well, the saga of the west wall has nearly come to an end. The siding is all done, and damn it looks good. I love wood.

The only thing left on this side is the fascia along the gables of the roof, and maybe some white trim on the fascia of the porch.

It also helps to see the sun after several days of drizzle. The blue sky looks extra good against this cream coloured wooden siding (soon to be gray).

Still have the front sides of the house to cover. There are more windows here, so they could be a while. The siding goes up quick. It's the trim around the windows that needs careful sealing to prevent water infiltration.

Sunday, September 5, 2010

Project evolution: before, during, and after

Saturday, Sept 4, 2010
Thursday, June 23, 2010Thursday, June 2, 2010
Wednesday, March 17, 2010Wednesday, March 3, 2010Friday, January 22, 2010
Erected frame: Dec. 18, 2009Insulated foundation: Nov. 10, 2009
Foundation done before backfill: Oct. 25, 2009 We're on the rock. About 1-2 ft of soil, clay, and sand was removed. Seems the site is a little flatter than anticipated.

During excavation: Oct. 1, 2009Before excavation: Sept. 10, 2009

Window trim detail

This is the north-side bedroom window. All the windows will look like this when we're done (well, maybe the photographer won't be reflected in the panes all the time). The Maibec ultra-white trim is 4'' wide and 1 1/4'' thick, matching the white cladding on the windows. If you look carefully you'll see that the trim on top is covered with a little "roof". At this close range you can actually see the candle distort the perspective slightly.

The picture below shows the detail of the bottom right corner. You can see the white painted nails in the trim and the stainless steel nails in the hemlock siding. You can also see the paint seal used between the horizontal trim below the window and the vertical trim to the right of the window. Also visible is the white caulking used to seal the window and trim.

Corner moulding trim details

Here's a picture showing the moulding details on the corner trim and siding. The white mouldings were first nailed down using zinc galvinized nails from Maibec painted and textured to match the siding. The natural hemlock siding is nailed down using stainless steel nails to make sure they do not leave ugly rust streaks on the wood siding in a few years time. We chose a clear (as opposed to white) seal to close the gab between the two. Hemlock does not shrink lengthwise as much as other wood, so hopefully this gap will stay closed.

I think Alex, Gord, and Joey really enjoy this part of the job. They are paying extra attention to detail. It's worth the extra time they take to seal up the joints nicely. It assures we won't have to do this again in 5 or 10 years time (knock wood!).

Soffits

What's a soffit anyways? A soffit is a decorative piece of wood, aluminum, or PVC that covers the underside of a roof overhang. It keeps critters and water from infiltrating the underside of your roof. It needs to include vents because you want air to be able to circulate between your roof covering and your insulation to prevent condensation and to prevent nasty ice dams from forming along the edge of your roof when temperatures start dipping below freezing. Unless the underside of your roof covering is vented, heat from the house will melt snow on the upper reaches of your roof. This will then freeze when it trickles down to the overhang, causing the water to pool and the roof to leak.

So here are the vented soffits on the edge of the kitchen. We used leftover boards from the ceiling. We had plenty leftover because the supplier of the planks sent about 20% more than ordered; dried hemlock usually splinters quite a bit. We've been handling it carefully, so we had maybe only 5% waste. The carpenters brought in strips of white coated aluminum for the vents. They will look much better when the fascias (roof edges) are also covered in white Maibec.

Time to put on the soffits!

Here's Lisa checking out what was a humongous hornets nest growing under the gables of the south side of the house. Apparantly, the wasps and hornets like our house almost as much as we do. Gordie and Joey knocked down part of the nest with a long piece of Maibec, and Alex proceeded to finish it off with a can of raid. The warm weather we've been having probably helped to keep the nest growing. There are still a few angry looking hornets swarming around up there. Hopefully the cooler weather will keep the nest from growing again.

Several creatures have alrady visited the home. Early in the spring, chickadees would fly in the open doorways and not be able to find their way out again. Phoebe's made a nest in a few cornices, and the cat already hunted down a few mice that may their way in through open doorways. I think I heard a few squirrels scratching around in the roof above the kitchen too. Hopefully, having the doors installed and sealing up the soffits will prevent these visits in the future.

Foundation covering

I know this picture isn't pretty, but this part of the job has been put off and has kept me up nights, so it's a big deal to see it getting done. We covered the exposed part of the foundation insulation with about 1 foot of coated white aluminum flashing. Note that it is folded over the bottom of the wall furring to prevent vermin from crawling in the walls between the siding (not shown), sheathing (white), and furring strips (wooden). Gord has a special tool for bending metal like this.

The blue foundation insulation is already discolored from the morning sun beating down on it all summer. It was about time we covered it up. Hopefully, it didn't lose too much of its insulation value. This is on the east side of the house. The corner trim actually helps to hold it in place for now, and it will eventually be covered by siding. Alex was worried that the white flashing would look too white and get too dirty looking once it's been on for a while. As it turns out, it actually takes on a little bit of a grayish tinge when contrasted with the ultra-white of the Maibec trim, so it doesn't look too bad.

Saturday, September 4, 2010

Trim and mouldings

Despite having enough hemlock boards for trim, we decided to go with Maibec for the corner boards, window trim, and fascias. The reason is that we wanted a little colour in the hose to accent the natural wood of the rabbeted bevel siding, especially when it starts turning grey. Maibec is wood coated with several layers of factory-coated paint with the paint lasting about 20 years (we don't want to paint it every two years). We chose ultra-white because it matches the cladding on the windows and because it makes for a nice bright contrast to the natural wood siding (and with the grey once the siding is weathered). The guys managed to finish the bottom half of the west side of the house and are getting the scaffolding up again to finish the upper part of the house.

Here's a picture of an outside corner with the west side finished with siding and the south side unfinished. The corner is constructed using two 2'' boards painted on all sides. It is nailed to the furring lats and over white aluminum flashing that covers the blue insulation on the foundation. We should have covered the foundation insulation before back-filling it. Styrofoam is resistant to just about everything except UV radiation from the sun.

Thursday, September 2, 2010

More siding

Darn, this looks good.

I think I might put a sealant on the bottom two planks to keep them from turning grey prematurely.

Wednesday, September 1, 2010

Up goes the siding

Here's the siding going up on the North side of the house outside the bedroom window. Wow does it look good. This is the siding we had sawn from logs out of the woods. Also shown is the window and corner trim from Maibec (white). Maibec is wood treated with paint that's supposed to last 20 years. The effect of the white trim will be to offset the hemlock siding (which we will let go grey like an old barn). The hemlock tends to crack, but there doesn't seem to be more than 10% wasted for now.

Also shown is the white flashing covering the foundation insulation. Hold have put this on a long time ago. Better late than never.